Prior to our SRC (Student Recreation Center) opening on July 10, 2009
New pictures of our pool - - we have water!
May 22, 2009

This shot is looking west into the pool, from the lobby.

Taken from 2nd floor, overlooking pool area

Another view from 2nd floor, overlooking pool

Our new whirlpool!
NEW VIDEO TOUR!!
The video at the top of this page takes you on a virtual tour of our new Rec Center, from artist renderings to photographs taken inside the Rec Center construction area.
WATCH IT!
Check out an awesome
gallery of professional photos of our Rec Center
construction taken by ISU's staff photographer on 3/30/09
See
photos taken during our tour of the new Student Rec Center
on 4/7/09
See a
video interview with our Director, John Lentz, and
read a story about the Re Center from a student's point of view
**********
**** NEW Rec Center pictures ****

Feb. 25, 2009 - Pool and whirlpool areas

Feb. 25, 2009 - Fitness Room on 2nd floor

Feb. 19, 2009 - Membership Services area
Jan. 9, 2009 - Front windows to pool area.
Jan. 8, 2009 - South entrance to new Student Recreation
Center.
You will soon see new material covering the yellow areas.
Jan. 8, 2009 - Pool area viewed from 2nd floor, facing west.

Jan. 8, 2009 - Pool area viewed from 2nd floor, looking south.
Jan. 8, 2009 - Gym Interior, looking north.
July 15, 2008 - From the pool looking west. The lap
pool is in the foreground, with the
leisure pool in the background. Locker areas are on the right.
At top to right is the Fitness Center area, Lincoln Quad is in the
background.
July 15, 2008 - Second floor view. This is the Fitness
Center area, looking east.
It overlooks the pool on the right, on the far right you can see
railing for the walking track.

April 11, 2008 - View from top of the Cunningham
Library: steel being erected
at pool on left, foreground shows 2nd level fitness studios with office
suite below.
Tall roof on left is Fitness Center. Roof on right is over 3-court gym.

Feb. 20, 2008 - The view from top of Lincoln Quad:
Fitness Center in foreground
and pool ground construction is on right.

Feb. 8, 2008 - The view shows steel being erected on
the west side of the facility
(facing Lincoln Quad). This includes the first floor locker rooms and
second floor fitness center.
Jan. 25, 2008 - Roof trusses are nearly completed for
north/south orientation. East/west trusses for
fitness center will start when pool is further advanced on opposite
side. Future pictures will
probably come from west side, a view from atop Lincoln Quad.
Jan. 2, 2008 - View shows vertical steel beams going up
along sides of main gymnasium running north
(to right side and top of picture). Left side of picture shows main
entrance and administrative wing
on first floor and three studios on second floor.
Dec. 18, 2007 - Steel going up! Steel beams can be seen erected at the southeast corner and main entrance on the south face of the new Student Recreation Center. This portion holds the main entrance, administrative offices and juice bar on the first floor and the three fitness studios on the second floor.

Dec. 3, 2007 - This shows final phase of
excavation work. The pool outline can easily be seen
and gravel sub-base has been laid over most of project. Steel delivered next
week!

Nov. 14, 2007 - Most footers have been poured and you can see the column pads. The pool
surge tank can be seen in the upper middle.

Oct. 22, 2007 - Workers are backfilling trenches used to pour footers. Column bases can
be seen throughout.

Oct. 11, 2007 - Wow, look at 'em go!

Sept. 21, 2007 - On the top left corner they continue to dig the pool, and you can see footers dug with
plumbing drain pipes visible.

Aug. 23, 2007 - The crew begins to dig the hole for our swimming pool mechanical room!